Antelope 7 Wellsite, Papua New Guinea

  • Preliminary Design and site selection for Design and Build for tender purposes
  • Topographical surveys in jungle terrain
  • Rig and service layout
  • Full Design Service
  • Geotechnical investigations and engineering
  • Support to contractor’s Materials and Logistics Department
  • Contractor Project Leads
Gulf Province, Papua New Guinea

Fairways Development The Links

  • Subdivision Due Diligence Investigation
  • Resource Consent
  • Heritage NZ & Local Iwi Consultation
  • Civil & Infrastructure Design
  • Site Supervision & Contract Documentation
  • Survey Setout & Asbuilt
  • Topographic Survey & LT Subdivision
  • Drone Aerial Photography
The Links, Bell Block, New Plymouth

Novotel New Plymouth

  • Resource Consents and Environmental impact assessments
  • Topographic survey
  • Construction survey set out
  • Legal and easement survey
  • Traffic assessment and monitoring
  • Environmental compliance
Leach Street, New Plymouth

BP Moturoa Service Station

  • Resource consent applications
  • Contaminated land assessment
  • Topographical survey
  • Traffic assessment
  • Construction survey set out
  • Structural design
  • Onsite Stormwater design
  • Construction management & supervision
Breakwater Road, New Plymouth

Taranaki Masonic Trust
Manadon Retirement Village

  • Resource consent
  • Contaminated soil investigation
  • Topographic survey
  • Civil and infastructure design
  • Contract documentation
  • Site supervision
  • Easement survey
New Plymouth, Taranaki

3D data capture and modelling of the New Plymouth CBD

BTW Company commissioned the capture and processing of point cloud data from an Unmanned Aerial Vehicle (UAV). A 3D model of the CBD was created, allowing the user to visualise and analyse the effects of building heights on the landscape.

New Plymouth, Taranaki

TSB Showplace earthquake strengthening

  • Structural assessment
  • Earthquake strengthening design and drawings
  • Tender documentation and tender award
  • Contract management and supervision
  • For more information click here
New Plymouth, Taranaki

FPSO Umuroa
Blast Wall Survey

BTW COMPANY recently carried out a 3D laser survey on the port and starboard sides of the Production Storage and Offloading (FPSO) vessel, the "Umuroa". This was for the purpose of creating a 3D as-built model of connection points and potential clash items for  the purposed blast walls and new stairways

New Plymouth, Taranaki

Todd Energy
Pipeline

McKee Production Station to Maui Tie-in

  • Initial route selection and topographical survey
  • Pipeline alignment sheets (design)
  • Pipeline set out survey
  • Pipeline as built survey
  • Pipeline as built alignment sheets
  • Easements
Tikorangi, Taranaki

Todd Energy
Te Kiri Wellsite

  • Site selection
  • Wellsite consenting
  • Wellsite design
  • Wellsite set out
  • Wellsite construction supervision
Kahui, South Taranaki

BTW a "One Stop Shop" for Projects

talk to us about how we can help
© BTW Company 2017 Website by Apex DigitalApex Digital